Downtown lane closures and detours from October 7 to 15, 2024




Road Closures and Detours Update:


  1. July 29 - November 30: Sunnyside Flood Barrier, eastbound Memorial Drive closed between 9 St N.W. and Centre St. Two-way traffic on the westbound lanes.

  2. October 7 – November 1: 26 Avenue S.E. from 11 St to Dartmouth Rd S.E. There will be various lane closures and detours while the work is underway, please watch for signage.

  3. Ongoing until October 31: 4 Ave Flyover reduced to a single lane.

  4. Mission Bridge full closure in November, date to be confirmed.

  5. 17 Avenue S.W.

    September 21 – October 19: 17 Ave S.W. eastbound lanes closed between 7 and 8 St S.W. with two-way traffic set up on the westbound lanes.

    September 21 – October 19: 17 Ave S.W. eastbound lanes closed between 11 and 12 St S.W. with two-way traffic on the eastbound lanes.

  6. July 22 – October 11: Two-way traffic set up on 3 Ave S.W. at 1 St S.W.

  7. November 4 – December 7: 5 St S.W. right lane and alley closure between 7 and 8 Ave S.W.

  8. September 9 – November 2: 1 Ave N.E. westbound lanes closed between 8A and 9A St N.E.

  9. September 16 – November 2: 1 Ave N.E. westbound lanes closed between 6A and 7 St N.E. with two-way traffic set up on the eastbound lanes.


Please note that the dates for these closures and detours are subject to change based on construction schedules in the area. We recommend you utilize the resources provided at calgary.ca/trafficinfo for the latest updates.